D&D Plastering
Services · 04

Painting

Most paint failures are prep failures. We feather every patch, sand to 220 where it matters, and prime with the right primer for the substrate, not the cheapest one in the truck.

Painter spraying finish color along the fascia of a textured stucco exterior
Cut line at the ceiling, brushed rather than taped. Interior repaint, Southern Utah.
PT-00

What we do

A complete scope.

  • 01Mineral silicate exteriors
  • 02Limewash & roman clay
  • 03Interior level 5 finishing
  • 04Cabinet & millwork lacquer
  • 05Color matching
  • 06Specialty & decorative coatings
Cure schedule3 to 5 days on site
01Prep, mask1 to 2 d
02Prime4 h
03First coat4 h
04Second coatCure 30 d

Finishes

The sample board.

What painting actually looks and behaves like, finish by finish, with the specs we quote against.

Flat

01
Gloss0 to 5 at 60 degrees
HidesSubstrate and patching
WashesPoorly, burnishes
UseCeilings, low-traffic walls

Eggshell

02
Gloss10 to 25 at 60 degrees
HidesMinor substrate texture
WashesWithout flashing
UseLiving rooms, bedrooms

Satin

03
Gloss25 to 35 at 60 degrees
HidesLittle, shows waves
WashesRepeatedly
UseHalls, kids rooms, trim

Semi-gloss

04
Gloss35 to 70 at 60 degrees
HidesNothing, reads every flaw
WashesScrubbable
UseDoors, casing, wet rooms

Assembly

What is behind the finish.

Nearly every failure starts in a layer nobody sees once the wall is done. This is the order we build it in.

01 Stud16 in o.c.02 Sheathing03 StuccoCured, 28 d04 Masonry primer05 First coat06 Second coatASSEMBLY
Exterior coating buildup over cured stucco. Section, not to scale.
PT-DET
Why it matters

A wall painted right looks correct in any light. We test cuts on every job, full sheen on the actual substrate, before any final coat goes on.